Loading...
HomeMy WebLinkAbout2003-3764.Union Grievance.05-01-18 Decision Crown Employees Commission de ~~ Grievance Settlement reglement des griefs Board des employes de la Couronne ~-,... Suite 600 Bureau 600 Ontario 180 Dundas Sl. West 180 rue Dundas Ouest Toronto Ontario M5G 1Z8 Toronto (Ontario) M5G 1Z8 Tel. (416) 326-1388 Tel. (416) 326-1388 Fax (416) 326-1396 Telec. (416) 326-1396 GSB# 2003-3764 UNION# 2003-0999-0032 IN THE MATTER OF AN ARBITRATION Under THE CROWN EMPLOYEES COLLECTIVE BARGAINING ACT Before THE GRIEVANCE SETTLEMENT BOARD BETWEEN Ontano PublIc ServIce Employees Umon (Umon Gnevance) Union - and - The Crown In RIght of Ontano (Mimstry ofCommumty Safety and CorrectIOnal ServIces) Employer BEFORE Jamce Johnston Vice-Chair FOR THE UNION Nelson Roland BarrIster and SOlICItor FOR THE EMPLOYER Fateh SalIm Counsel Management Board Secretanat HEARING January 14 2005 2 Intenm DeCISIon At the heanng scheduled to deal wIth thIS matter It was agreed that the folloWIng process and tIme frames were appropnate a) The Mimstry shall provIde to the umon specIfics, IncludIng make, model, year etc wIth regard to the eqUIpment utIlIzed In the control rooms at the Central East CorrectIOnal Centre ("CECC") as soon as possIble b) Both partIes are In the process of obtaInIng the OpInIOn of an expert or experts In thIS case The specIfics of the eqUIpment noted above shall be referred to these experts and shall be addressed or utIlIzed by them In the preparatIOn of theIr reports c) Should eIther sIde wIsh to rely upon the report prepared by theIr respectIve expert In the proceedIngs before me, a copy of the report shall be provIded to the other sIde on or before February 11 2005 d) Once the reports have been prepared and/or exchanged as provIded for above, If upon further reflectIOn should eIther sIde wIsh to wIden the "pool" of eqUIpment analyzed by theIr respectIve experts to take Into account eqUIpment utIlIzed at another InstItutIOn or correctIOnal facIlIty the other party shall be ImmedIately notIfied. The party seekIng to Include addItIOnal eqUIpment shall provIde to the other sIde, to the extent possIble, the partIculars of thIS eqUIpment, IncludIng the locatIOn of It. e) The umon shall provIde partIculars to the Mimstry wIth regard to any extnnsIc eVIdence It IS seekIng to rely upon and the Mimstry shall provIde to the umon partIculars In support of the estoppel argument It has IndIcated an IntentIOn to make The partIes shall exchange these partIculars and any other partIculars that may be relevant to thIS case on or before February 18 2005 f) Both partIes shall have the opportumty to respond to the addItIOnal partIculars whIch they have receIved. Any such response shall be provIded to the other sIde on or before February 25 2005 g) There are In eXIstence IndIVIdual gnevances whIch raise some or all of the same Issues whIch are before me In the context of the umon gnevance The partIes have agreed that these gnevances shall be adJourned SIne dIe pendIng the resolutIOn of the umon gnevance Should It be necessary to deal wIth the IndIVIdual gnevances at some pOInt, they shall be scheduled for medIatIOn before me h) Once the umon IS In receIpt of full partIculars, It IS agreed that when the heanng of thIS matter commences, the umon shall proceed first to call ItS eVIdence Should there be any dIspute wIth regard to the exchange of partIculars and documents, or any other Issue, eIther party may contact the Gnevance Settlement Board or me dIrectly and request a 3 teleconference call to deal wIth the dIspute Any request for a teleconference call shall be dealt wIth and the call Itself scheduled as soon as possIble The partIes agreed to adJourn the prevIOusly scheduled dates of February 3 and February 15 2005 ThIS matter IS therefore scheduled to contInue on February 16 and 23 2005 Two addItIOnal dates, May 3 and May 13 2005 were also set. Dated at Toronto thIS 18th day of January 2005